Septic Systems Installation

Guidelines for designing proper performing OSSFs:

1.Flow equalization for all ATU's
2.Pressurized time dosing to field for systems with primary treatment only
3.Homeowner questionnaire
a.No ATU's if not perpetually occupied
4.Use TCEQ flows to establish average daily flows only
a.Use a project-specific peak flow multiplier for design
5.Do not depend on homeowner for success of system.
a.Automatic zone switching
i.verifiable
b.Automatic filter flushing
c.Automatic field flushing
d.Chlorine disinfection only if provider supplying Cl2 monthly
i.Ozone or UV disinfection, otherwise
e.Flow meter to verify system performance and usage
6.Electronic monitoring, if used, must verify system performance between visits
a.Auditable reporting
b.Verify communication integrity, at least monthly
c.Show system performance
i.Historical, at a minimum
ii.Real Time, for commercial
d.Service Provider's performance tracking
7.Commercial/Institutional Pretreatment Required
a.Determine wastewater characteristics
i.Influent
1.BOD, TSS, pH, COD, FOG, Temperature, Toxicity
2.Multiple samples
3.Multiple days
ii.Effluent
1.BOD >140
2.TSS >140
3.FOG > 10
4.pH = 7.0 approx.
b.Determine flows
i.GPM, avg
ii.GPM, peak
iii.GPD, avg
iv.GPD, peak
c.Determine balance of design using steps 1-5.



Previous Article : Septic System Pumps - - Next Article : Residential Septic System

Featured Articles
Providing Quality Service...Guaranteed In the Greater Austin Area of Travis, Hays, Williamson, Burnet, & Bastrop Counties , Onion Creek, Windmere, The Hills, Hays County, Dripping Springs, Buda, Jarrell, Georgetown, Brushy Creek, Bell County, Misc Locations.
Call (512) 338-1804 for fast, dependable service.
Pumping Frequencies The table below provides an estimate of pumping frequency in years, based on the size of the first tank in gallons, and the number of...
Seller Says "Too Bad" Seller Says “Too Bad” After Homebuyers Find Rotting Septic Tank Under Plywood (From Pumper Magazine, October 23, 2018) A news organization in Cortland Manor,...
Aerobic Treatment Unit First, please understand that the State has clearly stated it is the owner's responsibility to operate the aerobic treatment unit in compliance with all regulations...
  • Septic Fields The design of the septic drain field is determined by the size of the dwelling that it serves...
  • Compare Septic System The aerobic wastewater treatment plant is designed for the treatment of domestic wastewater and nothing else should go...
  • Field Septic System The design of the septic drain field is determined by the size of the dwelling that it serves...
  • Alternative Septic System Regarding your Home Aerobic Treatment Unit: The components in your home plant should be serviced at least...
  • Septic Drain Fields Care for your drainfieldYour drainfield is an important part of your septic system. Here are a few things...