Septic Tank Design
Value |
Pre 285 |
Per 285 |
Daily flow |
1080 gpd |
420 gpd |
Area of field |
5191 sf |
2100 sf |
Pretreatment |
2250 gallon |
475 gallon |
Treatment Capacity |
0 gpd |
500 gpd |
Pump Tank |
1000 gallon |
750 gallon |
Observed life span |
15 + years |
3 – 8 years |
Let's consider one real life example:
Residence in Austin, TX 78734
5,164 sf residence with an Aerobic/drip system
Class II soils placed over fractured rock
Area known for groundwater problems
Determination of Design Flow, Q:
Pre 285:
0 - 1500 sf 2 BR
1500 – 1900 sf 3 BR
800 sf = additional BR
1900 sf = 3 Bedrooms
(5164 – 1900) / 800 = 4.08 additional bedrooms.
Must round up to 5 additional bedrooms.
Number of Bedrooms = 3 + 5 = 8 Bedrooms
Q = (B + 1) x 120 gpd (with a 20% credit for low flow fixtures)
Qpre-285 = (8 + 1) x 120 gpd = 1080 gpd.
Per 285:
Table III, says less than 5500 sf is 6 Bedrooms.
6 Bedrooms, Qper-285 = 420 gpd.
Determination of Field Area:
Pre 285:
No specific guidance on drip, but
Generally accepted Ra < 0.1 gpd /sf
A = Q / Ra = 1080 / 0.1 = 10800 sf
Per 285:
Fractured rock, Ra = 0.2 gpd / sf
A = Q / Ra = 420 / 0.2 = 2100 sf
Note: Area provided = 2600 sf
Sizing of Tanks:
Pre 285:
Q = 1080 gpd
Pretreatment = 1000 gallon single compartment tank
Treatment = 1250 gpd
Pump tank = 1000 gallon single compartment tank, minimum
Per 285:
Q = 420 gpd
Pretreatment = 475 gallon
Treatment = 500 gpd
Pump tank = 750 gallon
Let's consider another real life example:
Residence in Austin, TX 78734
5,164 sf residence with an Aerobic/drip system
House built on fractured rock
Area known for groundwater problems
Determination of Design Flow, Q:
Pre 285:
0 - 1500 sf 2 BR
1500 – 1900 sf 3 BR
800 sf = additional BR
1900 sf = 3 Bedrooms
(5164 – 1900) / 800 = 4.08 additional bedrooms.
Must round up to 5 additional bedrooms.
Number of Bedrooms = 3 + 5 = 8 Bedrooms
Q = (B + 1) x 120 gpd (with a 20% credit for low flow fixtures)
Qpre-285 = (8 + 1) x 120 gpd = 1080 gpd.
Per 285:
Table III, says less than 5500 sf is 6 Bedrooms.
6 Bedrooms, Qper-285 = 420 gpd.
Determination of Field Area:
Pre 285:
LPD, ET sizing due to the lack of soil.
A = 31000 (1+ 8) / (70 – 16.25) = 5191sf (in two alternating fields)
Per 285:
LPD, Fractured rock, Ra = 0.2 gpd / sf
Theoretically, A = Q / Ra = 420 / 0.2 = 2100 sf
Realistically, A = 2100*5/3 = 3500 sf.
Sizing of Tanks:
Pre 285:
Q = 1080 gpd
Pretreatment
1250 + 4(250) = 2250 gallon dual compartment tank
Pump tank = 1000 gallon single compartment tank, minimum
Per 285:
Q = 420 gpd
Pretreatment = 475 gallon
Treatment = 500 gpd
Pump tank = 750 gallon
Previous Article : Septic Tank System - - Next Article : Septic Cleaner
-
Providing Quality Service...Guaranteed In the Greater Austin Area of Travis, Hays, Williamson, Burnet, & Bastrop Counties
, Hudson Bend, Volente, Westlake Hills, Buda, Kyle, San Marcos, Florence, Brushy Creek, Leander, Misc Locations, Bell County.
Call (512) 338-1804 for fast, dependable service.
-
Seller Says "Too Bad" Seller Says “Too Bad” After Homebuyers Find Rotting Septic Tank Under Plywood (From Pumper Magazine, October 23, 2018) A news organization in Cortland Manor,...
-
Septic Tank Additives There are many companies promoting their septic tank additives, saying they can solve all of your septic woes. For over 15 years, these claims have...
-
Why Stay On A Septic System? Top 5 Reasons for Preserving Onsite as a Viable, Even Preferred, Sewage Management Option: Better protection of public health is possible ...
-
Septic System Product A few communities around the country have established management programs that involve having a third party professional look...
-
Septic System Problems As a septic system owner you are responsible for ensuring that your septic system is safe and working...
-
Septic Leaching LEACHING SYSTEMSTrenches: Are linear excavations that are a maximum of 48" in width and 18" in height. Trenches...
-
Septic Tank Construction What do you do when your client's property doesn't have sewer service?Now you have a professional solution -...
-
Septic Concrete Quality control testing for compressive strength of cylindrical concrete specimens must be performed and recorded on test cylinders...